Edwards Sanborn 1C

Edwards Sanborn 1C is a 148 MW solar farm in Kern County, California, operated by Terra-Gen Operating Co-Hybrid. It has 2 generating units here, inside CAISO. Its units entered service in 2025.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
148 MW
148 MW net summer
Generating units
2
In service
2025
Plant code
68846

Where it is

Loading map…
County
Kern County, California
Coordinates
35.0262, -118.1529
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Terra-Gen Operating Co-Hybrid
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant operated by Terra-Gen Operating Co-Hybrid →

Edwards Sanborn 1C: FAQ

Where is Edwards Sanborn 1C?
In Kern County, California (CA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Edwards Sanborn 1C?
148 MW of nameplate capacity across 2 units, as of 2026-07.
Who owns Edwards Sanborn 1C?
Terra-Gen Operating Co-Hybrid is the operator of record. That is not always the ultimate owner.
Is this the same as Edwards Sanborn 1C LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Terra-Gen Operating Co-Hybrid here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Edwards Sanborn 1C LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Edwards Sanborn 1C still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.