Sutter Home Winery Westside

Sutter Home Winery Westside is a 2 MW solar farm in San Joaquin County, California, operated by REC SHW, LLC. It has 1 generating unit here, inside CAISO. Its unit entered service in 2025.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
2.3 MW
2.3 MW net summer
Generating units
1
In service
2025
Plant code
69039

Where it is

Loading map…
County
San Joaquin County, California
Coordinates
38.1521, -121.4022
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
REC SHW, LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Sutter Home Winery Westside: FAQ

Where is Sutter Home Winery Westside?
In San Joaquin County, California (CA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Sutter Home Winery Westside?
2 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Sutter Home Winery Westside?
REC SHW, LLC is the operator of record. That is not always the ultimate owner.
Is this the same as Sutter Home Winery Westside LLC?
Probably, but the plant data does not say. It records a plant name and an operator — REC SHW, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Sutter Home Winery Westside LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Sutter Home Winery Westside still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.