Morongo CRS 1

Morongo CRS 1 is a 3 MW solar farm in Riverside County, California, operated by Morongo Band of Mission Indians. EIA-860M lists 1 generating unit here, inside CAISO. Its unit entered service in 2024.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
3 MW
3 MW net summer
Generating units
1
In service
2024
EIA plant ID
69856

Where it is

Loading map…
County
Riverside County, California
Coordinates
33.5527, -116.476
Balancing authority
CISO
Sector
Electric Utility

Units, technology and status

Operator of record
Morongo Band of Mission Indians
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Morongo Band of Mission Indians reports to EIA →

Morongo CRS 1: FAQ

Where is Morongo CRS 1?
In Riverside County, California (CA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Morongo CRS 1?
3 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Morongo CRS 1?
EIA-860M names Morongo Band of Mission Indians as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Morongo CRS 1 LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Morongo Band of Mission Indians here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Morongo CRS 1 LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Morongo CRS 1 still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.