Five Points Pipeline

Five Points Pipeline is a 4 MW solar farm in Fresno County, California, operated by Maas Energy Works. It has 1 generating unit here, inside CAISO. Its unit entered service in 2025.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
4.1 MW
4.1 MW net summer
Generating units
1
In service
2025
Plant code
69900

Where it is

Loading map…
County
Fresno County, California
Coordinates
36.4765, -120.0123
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Maas Energy Works
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant operated by Maas Energy Works →

Five Points Pipeline: FAQ

Where is Five Points Pipeline?
In Fresno County, California (CA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Five Points Pipeline?
4 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Five Points Pipeline?
Maas Energy Works is the operator of record. That is not always the ultimate owner.
Is this the same as Five Points Pipeline LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Maas Energy Works here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Five Points Pipeline LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Five Points Pipeline still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.