Gilcrest Solar

Gilcrest Solar is a 2 MW solar farm in Weld County, Colorado, operated by Terraform Arcadia. EIA-860M lists 1 generating unit here. Its unit entered service in 2018.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
1.5 MW
1.5 MW net summer
Generating units
1
In service
2018
EIA plant ID
62663

Where it is

Loading map…
County
Weld County, Colorado
Coordinates
40.2894, -104.7836
Balancing authority
WACM
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Terraform Arcadia
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Terraform Arcadia reports to EIA →

Gilcrest Solar: FAQ

Where is Gilcrest Solar?
In Weld County, Colorado (CO). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Gilcrest Solar?
2 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Gilcrest Solar?
EIA-860M names Terraform Arcadia as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Gilcrest Solar LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Terraform Arcadia here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Gilcrest Solar LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Gilcrest Solar still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.