Pivot Solar 40

Pivot Solar 40 is a 3 MW solar farm in Weld County, Colorado, operated by Pivot Energy. It has 1 generating unit here. Its unit entered service in 2026.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
2.8 MW
2.8 MW net summer
Generating units
1
In service
2026
Plant code
69483

Where it is

Loading map…
County
Weld County, Colorado
Coordinates
40.3181, -104.9277
Balancing authority
PSCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Pivot Energy
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant operated by Pivot Energy →

Pivot Solar 40: FAQ

Where is Pivot Solar 40?
In Weld County, Colorado (CO). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Pivot Solar 40?
3 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Pivot Solar 40?
Pivot Energy is the operator of record. That is not always the ultimate owner.
Is this the same as Pivot Solar 40 LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Pivot Energy here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Pivot Solar 40 LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Pivot Solar 40 still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.