Lakeland Electric Co. (FL) - Airport II
Lakeland Electric Co. (FL) - Airport II is a 4 MW solar farm in Polk County, Florida, operated by Sun E N7 Holdings LLC. It has 1 generating unit here. Its unit entered service in 2012.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Nameplate capacity
- 3.5 MW
- 3.5 MW net summer
- Generating units
- 1
- In service
- 2012
- Plant code
- 59754
Where it is
Loading map…
- County
- Polk County, Florida
- Coordinates
- 27.9911, -82.0473
- Balancing authority
- TEC
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- Sun E N7 Holdings LLC
- Primary energy source
- Solar
- Technologies
- Solar Photovoltaic
- Status
- Operating
Lakeland Electric Co. (FL) - Airport II: FAQ
- Where is Lakeland Electric Co. (FL) - Airport II?
- In Polk County, Florida (FL). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
- How big is Lakeland Electric Co. (FL) - Airport II?
- 4 MW of nameplate capacity across 1 unit, as of 2026-07.
- Who owns Lakeland Electric Co. (FL) - Airport II?
- Sun E N7 Holdings LLC is the operator of record. That is not always the ultimate owner.
- Is this the same as Lakeland Electric Co. (FL) - Airport II LLC?
- Probably, but the plant data does not say. It records a plant name and an operator — Sun E N7 Holdings LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Lakeland Electric Co. (FL) - Airport II LLC" usually means this site. This page does not assert a corporate structure it cannot see.
- Is Lakeland Electric Co. (FL) - Airport II still running?
- Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.