Citrus Solar Energy Center Hybrid

Citrus Solar Energy Center Hybrid is a 79 MW solar farm in DeSoto County, Florida, operated by Florida Power & Light Co. EIA-860M lists 2 generating units here. Its units entered service between 2016 and 2018.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
78.5 MW
78.5 MW net summer
Generating units
2
In service
2016–2018
EIA plant ID
60061

Where it is

Loading map…
County
DeSoto County, Florida
Coordinates
27.3209, -81.8069
Balancing authority
FPL
Sector
Electric Utility

Units, technology and status

Operator of record
Florida Power & Light Co
Primary energy source
Solar
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. EIA-860M capacity splits: Solar 75 MW, Battery 4 MW. It is filed here under Solar, the source with the most capacity.

Every plant Florida Power & Light Co reports to EIA →

Citrus Solar Energy Center Hybrid: FAQ

Where is Citrus Solar Energy Center Hybrid?
In DeSoto County, Florida (FL). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Citrus Solar Energy Center Hybrid?
79 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
Who owns Citrus Solar Energy Center Hybrid?
EIA-860M names Florida Power & Light Co as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Citrus Solar Energy Center Hybrid LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Florida Power & Light Co here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Citrus Solar Energy Center Hybrid LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Citrus Solar Energy Center Hybrid still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.