Perry Solar Facility

Perry Solar Facility is a 5 MW solar farm in Taylor County, Florida, operated by Duke Energy Florida, LLC. It has 1 generating unit here. Its unit entered service in 2016.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
5.1 MW
5.1 MW net summer
Generating units
1
In service
2016
Plant code
60071

Where it is

Loading map…
County
Taylor County, Florida
Coordinates
30.1193, -83.56
Balancing authority
FPC
Sector
Electric Utility

Units, technology and status

Operator of record
Duke Energy Florida, LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant operated by Duke Energy Florida, LLC →

Perry Solar Facility: FAQ

Where is Perry Solar Facility?
In Taylor County, Florida (FL). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Perry Solar Facility?
5 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Perry Solar Facility?
Duke Energy Florida, LLC is the operator of record. That is not always the ultimate owner.
Is this the same as Perry Solar Facility LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Duke Energy Florida, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Perry Solar Facility LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Perry Solar Facility still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.