AEP Jacksonville Solar Project

AEP Jacksonville Solar Project is a 7 MW solar farm in Duval County, Florida, operated by Onsite Partners, LLC. EIA-860M lists 1 generating unit here. Its unit entered service in 2017.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
7.1 MW
7.1 MW net summer
Generating units
1
In service
2017
EIA plant ID
61388

Where it is

Loading map…
County
Duval County, Florida
Coordinates
30.5236, -81.6864
Balancing authority
JEA
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Onsite Partners, LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Onsite Partners, LLC reports to EIA →

AEP Jacksonville Solar Project: FAQ

Where is AEP Jacksonville Solar Project?
In Duval County, Florida (FL). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is AEP Jacksonville Solar Project?
7 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns AEP Jacksonville Solar Project?
EIA-860M names Onsite Partners, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as AEP Jacksonville Solar Project LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Onsite Partners, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "AEP Jacksonville Solar Project LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is AEP Jacksonville Solar Project still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.