Trailside Solar Center

Trailside Solar Center is a 75 MW solar farm in St Johns County, Florida, operated by Florida Power & Light Co. EIA-860M lists 1 generating unit here. Its unit entered service in 2020.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
74.5 MW
74.5 MW net summer
Generating units
1
In service
2020
EIA plant ID
62916

Where it is

Loading map…
County
St Johns County, Florida
Coordinates
29.775, -81.4279
Balancing authority
FPL
Sector
Electric Utility

Units, technology and status

Operator of record
Florida Power & Light Co
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Florida Power & Light Co reports to EIA →

Trailside Solar Center: FAQ

Where is Trailside Solar Center?
In St Johns County, Florida (FL). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Trailside Solar Center?
75 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Trailside Solar Center?
EIA-860M names Florida Power & Light Co as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Trailside Solar Center LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Florida Power & Light Co here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Trailside Solar Center LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Trailside Solar Center still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.