Hildreth Solar Power Plant

Hildreth Solar Power Plant is a 75 MW solar farm in Suwannee County, Florida, operated by Duke Energy Florida, LLC. EIA-860M lists 1 generating unit here. Its unit entered service in 2023.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
74.9 MW
74.9 MW net summer
Generating units
1
In service
2023
EIA plant ID
65170

Where it is

Loading map…
County
Suwannee County, Florida
Coordinates
29.9648, -82.8232
Balancing authority
FPC
Sector
Electric Utility

Units, technology and status

Operator of record
Duke Energy Florida, LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Duke Energy Florida, LLC reports to EIA →

Hildreth Solar Power Plant: FAQ

Where is Hildreth Solar Power Plant?
In Suwannee County, Florida (FL). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Hildreth Solar Power Plant?
75 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Hildreth Solar Power Plant?
EIA-860M names Duke Energy Florida, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Hildreth Solar Power Plant LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Duke Energy Florida, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Hildreth Solar Power Plant LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Hildreth Solar Power Plant still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.