Everglades Solar Energy Center

Everglades Solar Energy Center is a 75 MW solar farm in Miami Dade County, Florida, operated by Florida Power & Light Co. It has 1 generating unit here. Its unit entered service in 2023.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
74.5 MW
74.5 MW net summer
Generating units
1
In service
2023
Plant code
65423

Where it is

Loading map…
County
Miami Dade County, Florida
Coordinates
25.5425, -80.5543
Balancing authority
FPL
Sector
Electric Utility

Units, technology and status

Operator of record
Florida Power & Light Co
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant operated by Florida Power & Light Co →

Everglades Solar Energy Center: FAQ

Where is Everglades Solar Energy Center?
In Miami Dade County, Florida (FL). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Everglades Solar Energy Center?
75 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Everglades Solar Energy Center?
Florida Power & Light Co is the operator of record. That is not always the ultimate owner.
Is this the same as Everglades Solar Energy Center LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Florida Power & Light Co here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Everglades Solar Energy Center LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Everglades Solar Energy Center still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.