FPL Saw Palmetto Solar Energy Center

FPL Saw Palmetto Solar Energy Center is a 75 MW solar farm in Bay County, Florida, operated by Florida Power & Light Co. It has 1 generating unit here. Its unit entered service in 2023.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
74.5 MW
74.5 MW net summer
Generating units
1
In service
2023
Plant code
65592

Where it is

Loading map…
County
Bay County, Florida
Coordinates
30.4198, -85.4415
Balancing authority
FPL
Sector
Electric Utility

Units, technology and status

Operator of record
Florida Power & Light Co
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant operated by Florida Power & Light Co →

FPL Saw Palmetto Solar Energy Center: FAQ

Where is FPL Saw Palmetto Solar Energy Center?
In Bay County, Florida (FL). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is FPL Saw Palmetto Solar Energy Center?
75 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns FPL Saw Palmetto Solar Energy Center?
Florida Power & Light Co is the operator of record. That is not always the ultimate owner.
Is this the same as FPL Saw Palmetto Solar Energy Center LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Florida Power & Light Co here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "FPL Saw Palmetto Solar Energy Center LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is FPL Saw Palmetto Solar Energy Center still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.