Juniper Solar (FL)

Juniper Solar (FL) is a 70 MW solar farm in Pasco County, Florida, operated by Tampa Electric Co. It has 1 generating unit here. Its unit entered service in 2023.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
70 MW
70 MW net summer
Generating units
1
In service
2023
Plant code
65683

Where it is

Loading map…
County
Pasco County, Florida
Coordinates
28.1816, -82.1553
Balancing authority
TEC
Sector
Electric Utility

Units, technology and status

Operator of record
Tampa Electric Co
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant operated by Tampa Electric Co →

Juniper Solar (FL): FAQ

Where is Juniper Solar (FL)?
In Pasco County, Florida (FL). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Juniper Solar (FL)?
70 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Juniper Solar (FL)?
Tampa Electric Co is the operator of record. That is not always the ultimate owner.
Is this the same as Juniper Solar (FL) LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Tampa Electric Co here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Juniper Solar (FL) LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Juniper Solar (FL) still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.