Dover Solar and Battery Storage
Dover Solar and Battery Storage is a 40 MW solar farm in Hillsborough County, Florida, operated by Tampa Electric Co. EIA-860M lists 2 generating units here. Its units entered service between 2023 and 2024.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Nameplate capacity
- 40 MW
- 40 MW net summer
- Generating units
- 2
- In service
- 2023–2024
- EIA plant ID
- 66129
Where it is
Loading map…
- County
- Hillsborough County, Florida
- Coordinates
- 27.9559, -82.2014
- Balancing authority
- TEC
- Sector
- Electric Utility
Units, technology and status
- Operator of record
- Tampa Electric Co
- Primary energy source
- Solar
- Technologies
- Batteries, Solar Photovoltaic
- Status
- Operating
This site runs on more than one energy source. EIA-860M capacity splits: Solar 25 MW, Battery 15 MW. It is filed here under Solar, the source with the most capacity.
Dover Solar and Battery Storage: FAQ
- Where is Dover Solar and Battery Storage?
- In Hillsborough County, Florida (FL). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
- How big is Dover Solar and Battery Storage?
- 40 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
- Who owns Dover Solar and Battery Storage?
- EIA-860M names Tampa Electric Co as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
- Is this the same as Dover Solar and Battery Storage LLC?
- Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Tampa Electric Co here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Dover Solar and Battery Storage LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
- Is Dover Solar and Battery Storage still running?
- EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.