MLH 2
MLH 2 is a 1 MW solar farm in Alachua County, Florida, operated by CleanCapital Holdings. It has 1 generating unit here. Its unit entered service in 2013.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Nameplate capacity
- 1 MW
- 1 MW net summer
- Generating units
- 1
- In service
- 2013
- Plant code
- 69000
Where it is
Loading map…
- County
- Alachua County, Florida
- Coordinates
- 29.7041, -82.2924
- Balancing authority
- GVL
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- CleanCapital Holdings
- Primary energy source
- Solar
- Technologies
- Solar Photovoltaic
- Status
- Operating
MLH 2: FAQ
- Where is MLH 2?
- In Alachua County, Florida (FL). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
- How big is MLH 2?
- 1 MW of nameplate capacity across 1 unit, as of 2026-07.
- Who owns MLH 2?
- CleanCapital Holdings is the operator of record. That is not always the ultimate owner.
- Is this the same as MLH 2 LLC?
- Probably, but the plant data does not say. It records a plant name and an operator — CleanCapital Holdings here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "MLH 2 LLC" usually means this site. This page does not assert a corporate structure it cannot see.
- Is MLH 2 still running?
- Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.