Butler Solar Project 103

Butler Solar Project 103 is a 104 MW solar farm in Taylor County, Georgia, operated by Southern Power Co. EIA-860M lists 1 generating unit here. Its unit entered service in 2016.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
104 MW
100 MW net summer
Generating units
1
In service
2016
EIA plant ID
59896

Where it is

Loading map…
County
Taylor County, Georgia
Coordinates
32.5619, -84.2758
Balancing authority
SOCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Southern Power Co
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Southern Power Co reports to EIA →

Butler Solar Project 103: FAQ

Where is Butler Solar Project 103?
In Taylor County, Georgia (GA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Butler Solar Project 103?
104 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Butler Solar Project 103?
EIA-860M names Southern Power Co as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Butler Solar Project 103 LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Southern Power Co here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Butler Solar Project 103 LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Butler Solar Project 103 still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.