Hickory Park Solar Hybrid

Hickory Park Solar Hybrid is a 236 MW solar farm in Mitchell County, Georgia, operated by RWE Clean Energy. EIA-860M lists 2 generating units here. Its units entered service in 2022.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
235.5 MW
235.5 MW net summer
Generating units
2
In service
2022
EIA plant ID
63522

Where it is

Loading map…
County
Mitchell County, Georgia
Coordinates
31.2697, -84.1763
Balancing authority
SOCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
RWE Clean Energy
Primary energy source
Solar
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. EIA-860M capacity splits: Solar 196 MW, Battery 40 MW. It is filed here under Solar, the source with the most capacity.

Every plant RWE Clean Energy reports to EIA →

Hickory Park Solar Hybrid: FAQ

Where is Hickory Park Solar Hybrid?
In Mitchell County, Georgia (GA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Hickory Park Solar Hybrid?
236 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
Who owns Hickory Park Solar Hybrid?
EIA-860M names RWE Clean Energy as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Hickory Park Solar Hybrid LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — RWE Clean Energy here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Hickory Park Solar Hybrid LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Hickory Park Solar Hybrid still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.