Telfair Thompson

Telfair Thompson is a 2 MW solar farm in Telfair County, Georgia, operated by Westbound Solar LLC. EIA-860M lists 1 generating unit here. Its unit entered service in 2018.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
1.9 MW
1.9 MW net summer
Generating units
1
In service
2018
EIA plant ID
62883

Where it is

Loading map…
County
Telfair County, Georgia
Coordinates
32.0586, -82.8718
Balancing authority
SOCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Westbound Solar LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Westbound Solar LLC reports to EIA →

Telfair Thompson: FAQ

Where is Telfair Thompson?
In Telfair County, Georgia (GA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Telfair Thompson?
2 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Telfair Thompson?
EIA-860M names Westbound Solar LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Telfair Thompson LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Westbound Solar LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Telfair Thompson LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Telfair Thompson still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.