Solar BESS Hybrid

Solar BESS Hybrid is a 4 MW solar farm in Cobb County, Georgia, operated by Cobb Electric Membership Corporation. EIA-860M lists 3 generating units here. Its units entered service between 2020 and 2022.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
3.5 MW
3.4 MW net summer
Generating units
3
In service
2020–2022
EIA plant ID
63535

Where it is

Loading map…
County
Cobb County, Georgia
Coordinates
33.9793, -84.5561
Balancing authority
SOCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Cobb Electric Membership Corporation
Primary energy source
Solar
Technologies
Batteries, Natural Gas Fired Combustion Turbine, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. EIA-860M capacity splits: Solar 2 MW, Battery 1 MW, Natural gas 1 MW. It is filed here under Solar, the source with the most capacity.

Every plant Cobb Electric Membership Corporation reports to EIA →

Solar BESS Hybrid: FAQ

Where is Solar BESS Hybrid?
In Cobb County, Georgia (GA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Solar BESS Hybrid?
4 MW of nameplate capacity across 3 units, as of the EIA-860M release for 2026-07.
Who owns Solar BESS Hybrid?
EIA-860M names Cobb Electric Membership Corporation as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Solar BESS Hybrid LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Cobb Electric Membership Corporation here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Solar BESS Hybrid LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Solar BESS Hybrid still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.