Wilkinson DeFore (Safari Energy)

Wilkinson DeFore (Safari Energy) is a 3 MW solar farm in Wilkinson County, Georgia, operated by Safari Energy, LLC. EIA-860M lists 1 generating unit here. Its unit entered service in 2020.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
3 MW
3 MW net summer
Generating units
1
In service
2020
EIA plant ID
65481

Where it is

Loading map…
County
Wilkinson County, Georgia
Coordinates
32.8813, -83.3029
Balancing authority
SOCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Safari Energy, LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Safari Energy, LLC reports to EIA →

Wilkinson DeFore (Safari Energy): FAQ

Where is Wilkinson DeFore (Safari Energy)?
In Wilkinson County, Georgia (GA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Wilkinson DeFore (Safari Energy)?
3 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Wilkinson DeFore (Safari Energy)?
EIA-860M names Safari Energy, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Wilkinson DeFore (Safari Energy) LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Safari Energy, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Wilkinson DeFore (Safari Energy) LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Wilkinson DeFore (Safari Energy) still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.