FreeState Crooked Post Solar I

FreeState Crooked Post Solar I is a 2 MW solar farm in Shawnee County, Kansas, operated by Evergy Kansas Central, Inc. EIA-860M lists 1 generating unit here, inside SPP. Its unit entered service in 2023.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
1.6 MW
1.6 MW net summer
Generating units
1
In service
2023
EIA plant ID
66883

Where it is

Loading map…
County
Shawnee County, Kansas
Coordinates
38.9935, -95.8156
Balancing authority
SWPP
Sector
Electric Utility

Units, technology and status

Operator of record
Evergy Kansas Central, Inc
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Evergy Kansas Central, Inc reports to EIA →

FreeState Crooked Post Solar I: FAQ

Where is FreeState Crooked Post Solar I?
In Shawnee County, Kansas (KS). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is FreeState Crooked Post Solar I?
2 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns FreeState Crooked Post Solar I?
EIA-860M names Evergy Kansas Central, Inc as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as FreeState Crooked Post Solar I LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Evergy Kansas Central, Inc here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "FreeState Crooked Post Solar I LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is FreeState Crooked Post Solar I still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.