FreeState Crooked Post Solar I
FreeState Crooked Post Solar I is a 2 MW solar farm in Shawnee County, Kansas, operated by Evergy Kansas Central, Inc. It has 1 generating unit here, inside SPP. Its unit entered service in 2023.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Nameplate capacity
- 1.6 MW
- 1.6 MW net summer
- Generating units
- 1
- In service
- 2023
- Plant code
- 66883
Where it is
Loading map…
- County
- Shawnee County, Kansas
- Coordinates
- 38.9935, -95.8156
- Balancing authority
- SWPP
- Sector
- Electric Utility
Units, technology and status
- Operator of record
- Evergy Kansas Central, Inc
- Primary energy source
- Solar
- Technologies
- Solar Photovoltaic
- Status
- Operating
FreeState Crooked Post Solar I: FAQ
- Where is FreeState Crooked Post Solar I?
- In Shawnee County, Kansas (KS). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
- How big is FreeState Crooked Post Solar I?
- 2 MW of nameplate capacity across 1 unit, as of 2026-07.
- Who owns FreeState Crooked Post Solar I?
- Evergy Kansas Central, Inc is the operator of record. That is not always the ultimate owner.
- Is this the same as FreeState Crooked Post Solar I LLC?
- Probably, but the plant data does not say. It records a plant name and an operator — Evergy Kansas Central, Inc here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "FreeState Crooked Post Solar I LLC" usually means this site. This page does not assert a corporate structure it cannot see.
- Is FreeState Crooked Post Solar I still running?
- Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.