Town of Needham VNEM CSG

Town of Needham VNEM CSG is a 3 MW solar farm in Norfolk County, Massachusetts, operated by Tesla Inc.. EIA-860M lists 1 generating unit here, inside ISO New England. Its unit entered service in 2016.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
3 MW
3 MW net summer
Generating units
1
In service
2016
EIA plant ID
60110

Where it is

Loading map…
County
Norfolk County, Massachusetts
Coordinates
42.2767, -71.2594
Balancing authority
ISNE
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Tesla Inc.
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Tesla Inc. reports to EIA →

Town of Needham VNEM CSG: FAQ

Where is Town of Needham VNEM CSG?
In Norfolk County, Massachusetts (MA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Town of Needham VNEM CSG?
3 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Town of Needham VNEM CSG?
EIA-860M names Tesla Inc. as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Town of Needham VNEM CSG LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Tesla Inc. here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Town of Needham VNEM CSG LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Town of Needham VNEM CSG still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.