West Brookfield Solar - Gilbertsville Rd
West Brookfield Solar - Gilbertsville Rd is a 4 MW solar farm in Worcester County, Massachusetts, operated by Nautilus Solar Solutions. EIA-860M lists 1 generating unit here, inside ISO New England. Its unit entered service in 2017.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Nameplate capacity
- 4 MW
- 4 MW net summer
- Generating units
- 1
- In service
- 2017
- EIA plant ID
- 61629
Where it is
Loading map…
- County
- Worcester County, Massachusetts
- Coordinates
- 42.2725, -72.2103
- Balancing authority
- ISNE
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- Nautilus Solar Solutions
- Primary energy source
- Solar
- Technologies
- Solar Photovoltaic
- Status
- Operating
West Brookfield Solar - Gilbertsville Rd: FAQ
- Where is West Brookfield Solar - Gilbertsville Rd?
- In Worcester County, Massachusetts (MA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
- How big is West Brookfield Solar - Gilbertsville Rd?
- 4 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
- Who owns West Brookfield Solar - Gilbertsville Rd?
- EIA-860M names Nautilus Solar Solutions as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
- Is this the same as West Brookfield Solar - Gilbertsville Rd LLC?
- Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Nautilus Solar Solutions here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "West Brookfield Solar - Gilbertsville Rd LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
- Is West Brookfield Solar - Gilbertsville Rd still running?
- EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.