Hopkinton CSG

Hopkinton CSG is a 2 MW solar farm in Middlesex County, Massachusetts, operated by Altus Power America Management, LLC. It has 1 generating unit here, inside ISO New England. Its unit entered service in 2019.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
2 MW
2 MW net summer
Generating units
1
In service
2019
Plant code
62760

Where it is

Loading map…
County
Middlesex County, Massachusetts
Coordinates
42.2035, -71.5315
Balancing authority
ISNE
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Altus Power America Management, LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant operated by Altus Power America Management, LLC →

Hopkinton CSG: FAQ

Where is Hopkinton CSG?
In Middlesex County, Massachusetts (MA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Hopkinton CSG?
2 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Hopkinton CSG?
Altus Power America Management, LLC is the operator of record. That is not always the ultimate owner.
Is this the same as Hopkinton CSG LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Altus Power America Management, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Hopkinton CSG LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Hopkinton CSG still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.