Carver CSG

Carver CSG is a 2 MW solar farm in Plymouth County, Massachusetts, operated by Altus Power America Management, LLC. It has 1 generating unit here, inside ISO New England. Its unit entered service in 2019.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
2 MW
2 MW net summer
Generating units
1
In service
2019
Plant code
62763

Where it is

Loading map…
County
Plymouth County, Massachusetts
Coordinates
41.906, -70.8105
Balancing authority
ISNE
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Altus Power America Management, LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant operated by Altus Power America Management, LLC →

Carver CSG: FAQ

Where is Carver CSG?
In Plymouth County, Massachusetts (MA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Carver CSG?
2 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Carver CSG?
Altus Power America Management, LLC is the operator of record. That is not always the ultimate owner.
Is this the same as Carver CSG LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Altus Power America Management, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Carver CSG LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Carver CSG still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.