Nautilus Winsted Solar (CSG)

Nautilus Winsted Solar (CSG) is a 3 MW solar farm in McLeod County, Minnesota, operated by Nautilus Solar Solutions. It has 1 generating unit here, inside MISO. Its unit entered service in 2019.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
3 MW
3 MW net summer
Generating units
1
In service
2019
Plant code
62032

Where it is

Loading map…
County
McLeod County, Minnesota
Coordinates
44.9489, -94.0857
Balancing authority
MISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Nautilus Solar Solutions
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant operated by Nautilus Solar Solutions →

Nautilus Winsted Solar (CSG): FAQ

Where is Nautilus Winsted Solar (CSG)?
In McLeod County, Minnesota (MN). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Nautilus Winsted Solar (CSG)?
3 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Nautilus Winsted Solar (CSG)?
Nautilus Solar Solutions is the operator of record. That is not always the ultimate owner.
Is this the same as Nautilus Winsted Solar (CSG) LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Nautilus Solar Solutions here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Nautilus Winsted Solar (CSG) LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Nautilus Winsted Solar (CSG) still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.