El Dorado Springs Solar Farm

El Dorado Springs Solar Farm is a 3 MW solar farm in Cedar County, Missouri, operated by Missouri Jnt Muni.Pwr Elec. Ut. Comm.. It has 1 generating unit here, inside SPP. Its unit entered service in 2018.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
2.5 MW
2.5 MW net summer
Generating units
1
In service
2018
Plant code
61566

Where it is

Loading map…
County
Cedar County, Missouri
Coordinates
37.8587, -94.0026
Balancing authority
SWPP
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Missouri Jnt Muni.Pwr Elec. Ut. Comm.
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant operated by Missouri Jnt Muni.Pwr Elec. Ut. Comm. →

El Dorado Springs Solar Farm: FAQ

Where is El Dorado Springs Solar Farm?
In Cedar County, Missouri (MO). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is El Dorado Springs Solar Farm?
3 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns El Dorado Springs Solar Farm?
Missouri Jnt Muni.Pwr Elec. Ut. Comm. is the operator of record. That is not always the ultimate owner.
Is this the same as El Dorado Springs Solar Farm LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Missouri Jnt Muni.Pwr Elec. Ut. Comm. here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "El Dorado Springs Solar Farm LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is El Dorado Springs Solar Farm still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.