American Goldfinch SCS ACY2 NJ, LLC

American Goldfinch SCS ACY2 NJ, LLC is a 4 MW solar farm in Burlington County, New Jersey, operated by Arevon Energy, Inc.. It has 1 generating unit here, inside PJM. Its unit entered service in 2020.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
3.9 MW
3.9 MW net summer
Generating units
1
In service
2020
Plant code
64360

Where it is

Loading map…
County
Burlington County, New Jersey
Coordinates
40.0856, -74.8409
Balancing authority
PJM
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Arevon Energy, Inc.
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant operated by Arevon Energy, Inc. →

American Goldfinch SCS ACY2 NJ, LLC: FAQ

Where is American Goldfinch SCS ACY2 NJ, LLC?
In Burlington County, New Jersey (NJ). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is American Goldfinch SCS ACY2 NJ, LLC?
4 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns American Goldfinch SCS ACY2 NJ, LLC?
Arevon Energy, Inc. is the operator of record. That is not always the ultimate owner.
Is American Goldfinch SCS ACY2 NJ, LLC still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.