Calabro Airport South Solar Project

Calabro Airport South Solar Project is a 1 MW solar farm in Suffolk County, New York, operated by Agilitas Energy, Inc.. It has 1 generating unit here, inside NYISO. Its unit entered service in 2019.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
1.2 MW
1.2 MW net summer
Generating units
1
In service
2019
Plant code
63498

Where it is

Loading map…
County
Suffolk County, New York
Coordinates
40.8115, -72.857
Balancing authority
NYIS
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Agilitas Energy, Inc.
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant operated by Agilitas Energy, Inc. →

Calabro Airport South Solar Project: FAQ

Where is Calabro Airport South Solar Project?
In Suffolk County, New York (NY). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Calabro Airport South Solar Project?
1 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Calabro Airport South Solar Project?
Agilitas Energy, Inc. is the operator of record. That is not always the ultimate owner.
Is this the same as Calabro Airport South Solar Project LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Agilitas Energy, Inc. here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Calabro Airport South Solar Project LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Calabro Airport South Solar Project still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.