Podunque Road CSG

Podunque Road CSG is a 5 MW solar farm in Allegany County, New York, operated by KSI II Consolidated, LLC. EIA-860M lists 1 generating unit here, inside NYISO. Its unit entered service in 2021.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
5 MW
5 MW net summer
Generating units
1
In service
2021
EIA plant ID
64125

Where it is

Loading map…
County
Allegany County, New York
Coordinates
42.4151, -78.2375
Balancing authority
NYIS
Sector
IPP Non-CHP

Units, technology and status

Operator of record
KSI II Consolidated, LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant KSI II Consolidated, LLC reports to EIA →

Podunque Road CSG: FAQ

Where is Podunque Road CSG?
In Allegany County, New York (NY). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Podunque Road CSG?
5 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Podunque Road CSG?
EIA-860M names KSI II Consolidated, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Podunque Road CSG LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — KSI II Consolidated, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Podunque Road CSG LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Podunque Road CSG still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.