Windsor Cooper HIill Solar, LLC

Windsor Cooper HIill Solar, LLC is a 5 MW solar farm in Bertie County, North Carolina, operated by Deriva Energy. EIA-860M lists 1 generating unit here, inside PJM. Its unit entered service in 2015.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
5 MW
5 MW net summer
Generating units
1
In service
2015
EIA plant ID
58847

Where it is

Loading map…
County
Bertie County, North Carolina
Coordinates
35.9819, -76.9178
Balancing authority
PJM
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Deriva Energy
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Deriva Energy reports to EIA →

Windsor Cooper HIill Solar, LLC: FAQ

Where is Windsor Cooper HIill Solar, LLC?
In Bertie County, North Carolina (NC). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Windsor Cooper HIill Solar, LLC?
5 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Windsor Cooper HIill Solar, LLC?
EIA-860M names Deriva Energy as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is Windsor Cooper HIill Solar, LLC still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.