Hornet Solar (TX)

Hornet Solar (TX) is a 600 MW solar farm in Swisher County, Texas, operated by Vesper Energy Development LLC. EIA-860M lists 1 generating unit here, inside ERCOT. Its unit entered service in 2025.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
600 MW
600 MW net summer
Generating units
1
In service
2025
EIA plant ID
65463

Where it is

Loading map…
County
Swisher County, Texas
Coordinates
34.4852, -101.9714
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Vesper Energy Development LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Vesper Energy Development LLC reports to EIA →

Hornet Solar (TX): FAQ

Where is Hornet Solar (TX)?
In Swisher County, Texas (TX). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Hornet Solar (TX)?
600 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Hornet Solar (TX)?
EIA-860M names Vesper Energy Development LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Hornet Solar (TX) LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Vesper Energy Development LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Hornet Solar (TX) LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Hornet Solar (TX) still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.