Five Wells Solar Center - Hybrid is a 618 MW solar farm in Bell County, Texas, operated by Five Wells Solar Center, LLC. It has 2 generating units here, inside ERCOT. Its units entered service between 2023 and 2024.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
617.9 MW
579 MW net summer
Generating units
2
In service
2023–2024
Plant code
66420

Where it is

Loading map…
County
Bell County, Texas
Coordinates
30.9986, -97.259
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Five Wells Solar Center, LLC
Primary energy source
Solar
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. Capacity splits: Solar 355 MW, Battery 263 MW. It is listed here under Solar, the energy source with the most capacity.

Five Wells Solar Center - Hybrid: FAQ

Where is Five Wells Solar Center - Hybrid?
In Bell County, Texas (TX). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Five Wells Solar Center - Hybrid?
618 MW of nameplate capacity across 2 units, as of 2026-07.
Who owns Five Wells Solar Center - Hybrid?
Five Wells Solar Center, LLC is the operator of record. That is not always the ultimate owner.
Is this the same as Five Wells Solar Center - Hybrid LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Five Wells Solar Center, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Five Wells Solar Center - Hybrid LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Five Wells Solar Center - Hybrid still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.