Milford Solar 1

Milford Solar 1 is a 99 MW solar farm in Beaver County, Utah, operated by Milford Solar 1, LLC. EIA-860M lists 1 generating unit here. Its unit entered service in 2020.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
99 MW
99 MW net summer
Generating units
1
In service
2020
EIA plant ID
62812

Where it is

Loading map…
County
Beaver County, Utah
Coordinates
38.4907, -113.0183
Balancing authority
PACE
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Milford Solar 1, LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Milford Solar 1, LLC reports to EIA →

Milford Solar 1: FAQ

Where is Milford Solar 1?
In Beaver County, Utah (UT). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Milford Solar 1?
99 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Milford Solar 1?
EIA-860M names Milford Solar 1, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Milford Solar 1 LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Milford Solar 1, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Milford Solar 1 LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Milford Solar 1 still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.