Graphite Solar I

Graphite Solar I is a 80 MW solar farm in Carbon County, Utah, operated by Greenbacker Renewable Energy Corporation. EIA-860M lists 1 generating unit here. Its unit entered service in 2022.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
80 MW
80 MW net summer
Generating units
1
In service
2022
EIA plant ID
64186

Where it is

Loading map…
County
Carbon County, Utah
Coordinates
39.5484, -110.7121
Balancing authority
PACE
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Greenbacker Renewable Energy Corporation
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Greenbacker Renewable Energy Corporation reports to EIA →

Graphite Solar I: FAQ

Where is Graphite Solar I?
In Carbon County, Utah (UT). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Graphite Solar I?
80 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Graphite Solar I?
EIA-860M names Greenbacker Renewable Energy Corporation as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Graphite Solar I LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Greenbacker Renewable Energy Corporation here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Graphite Solar I LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Graphite Solar I still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.