Copperton Solar Plant No. 1

Copperton Solar Plant No. 1 is a 30 MW solar farm in Salt Lake County, Utah, operated by Kennecott Utah Copper. It has 2 generating units here. Its units entered service between 2024 and 2025.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
30 MW
29.6 MW net summer
Generating units
2
In service
2024–2025
Plant code
64427

Where it is

Loading map…
County
Salt Lake County, Utah
Coordinates
40.5766, -112.0846
Balancing authority
PACE
Sector
Industrial Non-CHP

Units, technology and status

Operator of record
Kennecott Utah Copper
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Copperton Solar Plant No. 1: FAQ

Where is Copperton Solar Plant No. 1?
In Salt Lake County, Utah (UT). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Copperton Solar Plant No. 1?
30 MW of nameplate capacity across 2 units, as of 2026-07.
Who owns Copperton Solar Plant No. 1?
Kennecott Utah Copper is the operator of record. That is not always the ultimate owner.
Is this the same as Copperton Solar Plant No. 1 LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Kennecott Utah Copper here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Copperton Solar Plant No. 1 LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Copperton Solar Plant No. 1 still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.