Red Mesa Solar Project

Red Mesa Solar Project is a 72 MW solar farm in San Juan County, Utah, operated by NTUA Generation - Utah, LLC. It has 1 generating unit here. Its unit entered service in 2023.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
72 MW
72 MW net summer
Generating units
1
In service
2023
Plant code
66404

Where it is

Loading map…
County
San Juan County, Utah
Coordinates
37.1208, -109.4115
Balancing authority
PACE
Sector
IPP Non-CHP

Units, technology and status

Operator of record
NTUA Generation - Utah, LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Red Mesa Solar Project: FAQ

Where is Red Mesa Solar Project?
In San Juan County, Utah (UT). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Red Mesa Solar Project?
72 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Red Mesa Solar Project?
NTUA Generation - Utah, LLC is the operator of record. That is not always the ultimate owner.
Is this the same as Red Mesa Solar Project LLC?
Probably, but the plant data does not say. It records a plant name and an operator — NTUA Generation - Utah, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Red Mesa Solar Project LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Red Mesa Solar Project still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.