Red Mesa Solar Project
Red Mesa Solar Project is a 72 MW solar farm in San Juan County, Utah, operated by NTUA Generation - Utah, LLC. It has 1 generating unit here. Its unit entered service in 2023.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Nameplate capacity
- 72 MW
- 72 MW net summer
- Generating units
- 1
- In service
- 2023
- Plant code
- 66404
Where it is
Loading map…
- County
- San Juan County, Utah
- Coordinates
- 37.1208, -109.4115
- Balancing authority
- PACE
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- NTUA Generation - Utah, LLC
- Primary energy source
- Solar
- Technologies
- Solar Photovoltaic
- Status
- Operating
Red Mesa Solar Project: FAQ
- Where is Red Mesa Solar Project?
- In San Juan County, Utah (UT). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
- How big is Red Mesa Solar Project?
- 72 MW of nameplate capacity across 1 unit, as of 2026-07.
- Who owns Red Mesa Solar Project?
- NTUA Generation - Utah, LLC is the operator of record. That is not always the ultimate owner.
- Is this the same as Red Mesa Solar Project LLC?
- Probably, but the plant data does not say. It records a plant name and an operator — NTUA Generation - Utah, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Red Mesa Solar Project LLC" usually means this site. This page does not assert a corporate structure it cannot see.
- Is Red Mesa Solar Project still running?
- Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.