Crosswind Energy Project

Crosswind Energy Project is a 21 MW wind farm in Palo Alto County, Iowa, operated by Crosswind Holdco LLC. EIA-860M lists 1 generating unit here, inside SPP. Its unit entered service in 2007.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
21 MW
21 MW net summer
Generating units
1
In service
2007
EIA plant ID
56859

Where it is

Loading map…
County
Palo Alto County, Iowa
Coordinates
43.0475, -94.9228
Balancing authority
SWPP
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Crosswind Holdco LLC
Primary energy source
Wind
Technologies
Onshore Wind Turbine
Status
Operating

Every plant Crosswind Holdco LLC reports to EIA →

Crosswind Energy Project: FAQ

Where is Crosswind Energy Project?
In Palo Alto County, Iowa (IA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Crosswind Energy Project?
21 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Crosswind Energy Project?
EIA-860M names Crosswind Holdco LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Crosswind Energy Project LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Crosswind Holdco LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Crosswind Energy Project LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Crosswind Energy Project still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.