Cimarron Bend III
Cimarron Bend III is a 199 MW wind farm in Clark County, Kansas, operated by Enel Kansas, LLC. EIA-860M lists 1 generating unit here, inside SPP. Its unit entered service in 2020.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Nameplate capacity
- 198.8 MW
- 198.8 MW net summer
- Generating units
- 1
- In service
- 2020
- EIA plant ID
- 64074
Where it is
Loading map…
- County
- Clark County, Kansas
- Coordinates
- 37.371, -99.994
- Balancing authority
- SWPP
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- Enel Kansas, LLC
- Primary energy source
- Wind
- Technologies
- Onshore Wind Turbine
- Status
- Operating
Cimarron Bend III: FAQ
- Where is Cimarron Bend III?
- In Clark County, Kansas (KS). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
- How big is Cimarron Bend III?
- 199 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
- Who owns Cimarron Bend III?
- EIA-860M names Enel Kansas, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
- Is this the same as Cimarron Bend III LLC?
- Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Enel Kansas, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Cimarron Bend III LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
- Is Cimarron Bend III still running?
- EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.