Vansycle II Wind Energy Center

Vansycle II Wind Energy Center is a 102 MW wind farm in Umatilla County, Oregon, operated by FPL Energy Stateline II Inc. EIA-860M lists 1 generating unit here. Its unit entered service in 2009.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
102.3 MW
102.3 MW net summer
Generating units
1
In service
2009
EIA plant ID
58324

Where it is

Loading map…
County
Umatilla County, Oregon
Coordinates
45.8992, -118.5914
Balancing authority
PACW
Sector
IPP Non-CHP

Units, technology and status

Operator of record
FPL Energy Stateline II Inc
Primary energy source
Wind
Technologies
Onshore Wind Turbine
Status
Operating

Every plant FPL Energy Stateline II Inc reports to EIA →

Vansycle II Wind Energy Center: FAQ

Where is Vansycle II Wind Energy Center?
In Umatilla County, Oregon (OR). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Vansycle II Wind Energy Center?
102 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Vansycle II Wind Energy Center?
EIA-860M names FPL Energy Stateline II Inc as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Vansycle II Wind Energy Center LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — FPL Energy Stateline II Inc here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Vansycle II Wind Energy Center LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Vansycle II Wind Energy Center still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.