Panther Creek Wind Farm II

Panther Creek Wind Farm II is a 116 MW wind farm in Glasscock County, Texas, operated by RWE Clean Energy. EIA-860M lists 1 generating unit here, inside ERCOT. Its unit entered service in 2008.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
115.5 MW
124.7 MW net summer
Generating units
1
In service
2008
EIA plant ID
56921

Where it is

Loading map…
County
Glasscock County, Texas
Coordinates
31.9361, -101.2983
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
RWE Clean Energy
Primary energy source
Wind
Technologies
Onshore Wind Turbine
Status
Operating

Every plant RWE Clean Energy reports to EIA →

Panther Creek Wind Farm II: FAQ

Where is Panther Creek Wind Farm II?
In Glasscock County, Texas (TX). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Panther Creek Wind Farm II?
116 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Panther Creek Wind Farm II?
EIA-860M names RWE Clean Energy as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Panther Creek Wind Farm II LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — RWE Clean Energy here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Panther Creek Wind Farm II LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Panther Creek Wind Farm II still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.