Notrees Windpower Hybrid

Notrees Windpower Hybrid is a 189 MW wind farm in Ector County, Texas, operated by Deriva Energy. It has 3 generating units here, inside ERCOT. Its units entered service between 2009 and 2012.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
188.5 MW
188.5 MW net summer
Generating units
3
In service
2009–2012
Plant code
56961

Where it is

Loading map…
County
Ector County, Texas
Coordinates
31.995, -102.8283
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Deriva Energy
Primary energy source
Wind
Technologies
Batteries, Onshore Wind Turbine
Status
Operating

This site runs on more than one energy source. Capacity splits: Wind 153 MW, Battery 36 MW. It is listed here under Wind, the energy source with the most capacity.

Every plant operated by Deriva Energy →

Notrees Windpower Hybrid: FAQ

Where is Notrees Windpower Hybrid?
In Ector County, Texas (TX). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Notrees Windpower Hybrid?
189 MW of nameplate capacity across 3 units, as of 2026-07.
Who owns Notrees Windpower Hybrid?
Deriva Energy is the operator of record. That is not always the ultimate owner.
Is this the same as Notrees Windpower Hybrid LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Deriva Energy here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Notrees Windpower Hybrid LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Notrees Windpower Hybrid still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.