Notrees Windpower Hybrid
Notrees Windpower Hybrid is a 189 MW wind farm in Ector County, Texas, operated by Deriva Energy. It has 3 generating units here, inside ERCOT. Its units entered service between 2009 and 2012.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Nameplate capacity
- 188.5 MW
- 188.5 MW net summer
- Generating units
- 3
- In service
- 2009–2012
- Plant code
- 56961
Where it is
Loading map…
- County
- Ector County, Texas
- Coordinates
- 31.995, -102.8283
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- Deriva Energy
- Primary energy source
- Wind
- Technologies
- Batteries, Onshore Wind Turbine
- Status
- Operating
This site runs on more than one energy source. Capacity splits: Wind 153 MW, Battery 36 MW. It is listed here under Wind, the energy source with the most capacity.
Notrees Windpower Hybrid: FAQ
- Where is Notrees Windpower Hybrid?
- In Ector County, Texas (TX). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
- How big is Notrees Windpower Hybrid?
- 189 MW of nameplate capacity across 3 units, as of 2026-07.
- Who owns Notrees Windpower Hybrid?
- Deriva Energy is the operator of record. That is not always the ultimate owner.
- Is this the same as Notrees Windpower Hybrid LLC?
- Probably, but the plant data does not say. It records a plant name and an operator — Deriva Energy here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Notrees Windpower Hybrid LLC" usually means this site. This page does not assert a corporate structure it cannot see.
- Is Notrees Windpower Hybrid still running?
- Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.