Pyron Wind Farm LLC Hybrid

Pyron Wind Farm LLC Hybrid is a 259 MW wind farm in Fisher County, Texas, operated by RWE Clean Energy. EIA-860M lists 2 generating units here, inside ERCOT. Its units entered service between 2009 and 2018.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
258.9 MW
258.9 MW net summer
Generating units
2
In service
2009–2018
EIA plant ID
56981

Where it is

Loading map…
County
Fisher County, Texas
Coordinates
32.5886, -100.6728
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
RWE Clean Energy
Primary energy source
Wind
Technologies
Batteries, Onshore Wind Turbine
Status
Out of service but expected to return to service in next calendar year (1) · Operating (1)

This site runs on more than one energy source. EIA-860M capacity splits: Wind 249 MW, Battery 10 MW. It is filed here under Wind, the source with the most capacity.

Every plant RWE Clean Energy reports to EIA →

Pyron Wind Farm LLC Hybrid: FAQ

Where is Pyron Wind Farm LLC Hybrid?
In Fisher County, Texas (TX). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Pyron Wind Farm LLC Hybrid?
259 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
Who owns Pyron Wind Farm LLC Hybrid?
EIA-860M names RWE Clean Energy as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Pyron Wind Farm LLC Hybrid LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — RWE Clean Energy here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Pyron Wind Farm LLC Hybrid LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Pyron Wind Farm LLC Hybrid still running?
EIA-860M files it as "Out of service but expected to return to service in next calendar year" for 2026-07. Statuses change monthly, and this page follows the monthly release.