Pyron Wind Farm LLC Hybrid
Pyron Wind Farm LLC Hybrid is a 259 MW wind farm in Fisher County, Texas, operated by RWE Clean Energy. EIA-860M lists 2 generating units here, inside ERCOT. Its units entered service between 2009 and 2018.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Nameplate capacity
- 258.9 MW
- 258.9 MW net summer
- Generating units
- 2
- In service
- 2009–2018
- EIA plant ID
- 56981
Where it is
Loading map…
- County
- Fisher County, Texas
- Coordinates
- 32.5886, -100.6728
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- RWE Clean Energy
- Primary energy source
- Wind
- Technologies
- Batteries, Onshore Wind Turbine
- Status
- Out of service but expected to return to service in next calendar year (1) · Operating (1)
This site runs on more than one energy source. EIA-860M capacity splits: Wind 249 MW, Battery 10 MW. It is filed here under Wind, the source with the most capacity.
Pyron Wind Farm LLC Hybrid: FAQ
- Where is Pyron Wind Farm LLC Hybrid?
- In Fisher County, Texas (TX). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
- How big is Pyron Wind Farm LLC Hybrid?
- 259 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
- Who owns Pyron Wind Farm LLC Hybrid?
- EIA-860M names RWE Clean Energy as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
- Is this the same as Pyron Wind Farm LLC Hybrid LLC?
- Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — RWE Clean Energy here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Pyron Wind Farm LLC Hybrid LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
- Is Pyron Wind Farm LLC Hybrid still running?
- EIA-860M files it as "Out of service but expected to return to service in next calendar year" for 2026-07. Statuses change monthly, and this page follows the monthly release.