Stella Wind Farm

Stella Wind Farm is a 201 MW wind farm in Kenedy County, Texas, operated by RWE Clean Energy. EIA-860M lists 1 generating unit here, inside ERCOT. Its unit entered service in 2018.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
201 MW
201 MW net summer
Generating units
1
In service
2018
EIA plant ID
59063

Where it is

Loading map…
County
Kenedy County, Texas
Coordinates
26.9417, -97.6425
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
RWE Clean Energy
Primary energy source
Wind
Technologies
Onshore Wind Turbine
Status
Operating

Every plant RWE Clean Energy reports to EIA →

Stella Wind Farm: FAQ

Where is Stella Wind Farm?
In Kenedy County, Texas (TX). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Stella Wind Farm?
201 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Stella Wind Farm?
EIA-860M names RWE Clean Energy as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Stella Wind Farm LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — RWE Clean Energy here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Stella Wind Farm LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Stella Wind Farm still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.