Battery Storage Projects in Mississippi

Every operating battery storage project in Mississippi as of 2026-07: 1 plants, 2 storage units and 3 MW of nameplate capacity across 1 county.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Plants
1
2 generating units
Nameplate capacity
3 MW
Counties
1
Grid operator
Mixed
no single ISO covers a majority

Map of battery storage projects in Mississippi

Every one of the 1 plants is drawn at its reported coordinates.

Loading map…
  • Battery · 1

List of battery storage projects in Mississippi

Sort by any column. Capacity is nameplate, summed across every generating unit at the site.

battery storage projects in Mississippi
Walnut Grove Demonstration Plant2 technologiesMississippi Power CoLeake322023Operating

Largest battery storage projects in Mississippi

  1. 1Walnut Grove Demonstration PlantLeake County, Mississippi3 MW

Battery storage projects by county in Mississippi

The county each plant sits in. It is the fastest way to find the plant nearest a given town.

CountyPlantsNameplate MW
Leake13

Battery Storage Projects in Mississippi: FAQ

How many battery storage projects are in Mississippi?
1, with 3 MW of nameplate capacity between them, spread over 1 county. That is the operating count as of 2026-07.
Is there a map of Mississippi battery storage projects?
Yes — the map above. Each dot is one battery storage project, sized by nameplate capacity and placed at its reported site.
Which is the largest battery storage project in Mississippi?
Walnut Grove Demonstration Plant, at 3 MW. The table is sorted largest first, so the rest follow it.
Is there a battery storage project near me in Mississippi?
The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
Which grid operator runs Mississippi's battery storage projects?
No single ISO or RTO covers most of them. Each plant belongs to its own balancing authority, which in Mississippi is largely a vertically integrated utility rather than an organised market.
How current is this, and what is left out?
Data as of 2026-07, updated monthly. Grid-connected battery (electrochemical) storage of 1 MW and above. Plants below 1 MW are not included; retirements and additions after 2026-07 arrive with the next monthly update.