Davis Solar

Davis Solar is a 4 MW battery storage project in Orange County, New York, operated by Generate Capital. EIA-860M lists 2 generating units here, inside NYISO. Its units entered service in 2023.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
4 MW
4 MW net summer
Generating units
2
In service
2023
EIA plant ID
66488

Where it is

Loading map…
County
Orange County, New York
Coordinates
41.4245, -74.3603
Balancing authority
NYIS
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Generate Capital
Primary energy source
Battery
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. EIA-860M capacity splits: Battery 2 MW, Solar 2 MW. It is filed here under Battery, the source with the most capacity.

Every plant Generate Capital reports to EIA →

Davis Solar: FAQ

Where is Davis Solar?
In Orange County, New York (NY). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Davis Solar?
4 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
Who owns Davis Solar?
EIA-860M names Generate Capital as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Davis Solar LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Generate Capital here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Davis Solar LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Davis Solar still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.