Battery Storage Projects in Rhode Island
Every operating battery storage project in Rhode Island on EIA-860M for 2026-07: 1 plants, 1 storage units and 3 MW of nameplate capacity across 1 county, most of it inside ISO New England.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Plants
- 1
- 1 generating units
- Nameplate capacity
- 3 MW
- Counties
- 1
- Grid operator
- ISO New England
- covers most of these plants
Map of battery storage projects in Rhode Island
Every one of the 1 plants is drawn at the coordinate EIA files for it.
Loading map…
- Battery · 1
List of battery storage projects in Rhode Island
Sort by any column. Capacity is nameplate, summed across every generating unit EIA lists at the site.
| Ocean State BTMBatteries | Agilitas Energy, Inc. | Providence | 3 | 1 | 2022 | Operating |
Largest battery storage projects in Rhode Island
- 1Ocean State BTMProvidence County, Rhode Island3 MW
Battery storage projects by county in Rhode Island
The county EIA files against each plant. It is the fastest way to find the plant nearest a given town.
| County | Plants | Nameplate MW |
|---|---|---|
| Providence | 1 | 3 |
Battery Storage Projects in Rhode Island: FAQ
- How many battery storage projects are in Rhode Island?
- 1, with 3 MW of nameplate capacity between them, spread over 1 county. That is the EIA-860M operating count for 2026-07.
- Is there a map of Rhode Island battery storage projects?
- Yes — the map above. Each dot is one battery storage project, sized by nameplate capacity and placed at the coordinates EIA files for it.
- Which is the largest battery storage project in Rhode Island?
- Ocean State BTM, at 3 MW. The table is sorted largest first, so the rest follow it.
- Is there a battery storage project near me in Rhode Island?
- The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
- Which grid operator runs Rhode Island's battery storage projects?
- Most of them sit inside ISO New England, according to the balancing-authority code EIA files against each plant. Live conditions for that market are on this site.
- How current is this, and what is left out?
- EIA-860M for 2026-07. EIA technology "Batteries" — grid-connected electrochemical storage of 1 MW and above. Plants below 1 MW are not surveyed by EIA and so are absent; retirements and additions after 2026-07 arrive with the next monthly release.