Battery Storage Projects in South Carolina
Every operating battery storage project in South Carolina as of 2026-07: 1 plants, 2 storage units and 132 MW of nameplate capacity across 1 county.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Plants
- 1
- 2 generating units
- Nameplate capacity
- 132 MW
- Counties
- 1
- Grid operator
- Mixed
- no single ISO covers a majority
Map of battery storage projects in South Carolina
Every one of the 1 plants is drawn at its reported coordinates.
Loading map…
- Battery · 1
List of battery storage projects in South Carolina
Sort by any column. Capacity is nameplate, summed across every generating unit at the site.
| Lone Star Solar2 technologies | Lone Star Solar | Calhoun | 132 | 2 | 2024 | Operating |
|---|
Largest battery storage projects in South Carolina
- 1Lone Star SolarCalhoun County, South Carolina132 MW
Battery storage projects by county in South Carolina
The county each plant sits in. It is the fastest way to find the plant nearest a given town.
| County | Plants | Nameplate MW |
|---|---|---|
| Calhoun | 1 | 132 |
Battery Storage Projects in South Carolina: FAQ
- How many battery storage projects are in South Carolina?
- 1, with 132 MW of nameplate capacity between them, spread over 1 county. That is the operating count as of 2026-07.
- Is there a map of South Carolina battery storage projects?
- Yes — the map above. Each dot is one battery storage project, sized by nameplate capacity and placed at its reported site.
- Which is the largest battery storage project in South Carolina?
- Lone Star Solar, at 132 MW. The table is sorted largest first, so the rest follow it.
- Is there a battery storage project near me in South Carolina?
- The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
- Which grid operator runs South Carolina's battery storage projects?
- No single ISO or RTO covers most of them. Each plant belongs to its own balancing authority, which in South Carolina is largely a vertically integrated utility rather than an organised market.
- How current is this, and what is left out?
- Data as of 2026-07, updated monthly. Grid-connected battery (electrochemical) storage of 1 MW and above. Plants below 1 MW are not included; retirements and additions after 2026-07 arrive with the next monthly update.